H 1168

North Carolina HouseHouse Floor Calendar

Summary

H 1168, “Limit Electric Util. Hist. Fuel Cost Recovery”, was introduced in the House on Apr 30, 2026 by Rep. Terry Brown (D) with 27 co-sponsors. It was referred to Rules, Calendar, and Operations of the House, and last saw action on May 4, 2026: Ref To Com On Rules, Calendar, and Operations of the House.


Record

Text

H 1168 has 27 co-sponsors.

h1168/amended.txt
GENERAL ASSEMBLY OF NORTH CAROLINA
SESSION 2025
H 1
HOUSE BILL 1168
Short Title: Limit Electric Util. Hist. Fuel Cost Recovery. (Public)
Sponsors: Representatives T. Brown, Reives, Prather, and Pittman (Primary Sponsors).
For a complete list of sponsors, refer to the North Carolina General Assembly web site.
Referred to: Rules, Calendar, and Operations of the House
May 4, 2026
A BILL TO BE ENTITLED
AN ACT TO RESTORE CERTAIN LIMITATIONS PREVENTING ELECTRIC PUBLIC
UTILITIES FROM RECOVERING HISTORIC FUEL COSTS FROM CUSTOMERS.
The General Assembly of North Carolina enacts:
SECTION 1. G.S. 62-133.2(d) reads as rewritten:
"(d) The Commission shall provide for notice of a public hearing with reasonable and
adequate time for investigation and for all intervenors to prepare for hearing. At the hearing the
Commission shall receive evidence from the utility, the Public Staff, and any intervenor desiring
to submit evidence, and from the public generally. In reaching its decision, the Commission shall
consider all evidence required under subsection (c) of this section as well as any and all other
competent evidence that may assist the Commission in reaching its decision including changes
in the cost of fuel consumed and fuel-related costs that occur within a reasonable time, as
determined by the Commission, after the test period is closed. The Commission shall incorporate
in its cost of fuel and fuel-related costs determination under this subsection the experienced
over-recovery or under-recovery of reasonable costs of fuel and fuel-related costs prudently
incurred by the electric public utility, during the test period, based upon the prudent standards set
pursuant to subsection (d1) of this section, in fixing an increment or decrement rider. The
Commission shall not incorporate in this determination any fuel or fuel-related costs incurred
prior to the test period. Upon request of the electric public utility, the Commission shall also
incorporate in this determination the experienced over-recovery or under-recovery of costs of
fuel and fuel-related costs through the date that is 30 calendar days prior to the date of the hearing,
provided that the reasonableness and prudence of these costs shall be subject to review in the
utility's next annual hearing pursuant to this section. The Commission shall use deferral
accounting, and consecutive test periods, in complying with this subsection, and the
over-recovery or under-recovery portion of the increment or decrement shall be reflected in rates
for 12 months, notwithstanding any changes in the base fuel cost in a general rate case. Any
experienced over-recovery or under-recovery of reasonable fuel and fuel-related costs prudently
incurred during the test period shall accrue interest at the commercial paper rate as identified by
the Federal Reserve for A2/P2 nonfinancial issuers, or reasonable successor thereto, on a
weighted average basis over the applicable time period. The burden of proof as to the correctness
and reasonableness of the charge and as to whether the cost of fuel and fuel-related costs were
reasonably and prudently incurred shall be on the utility. The Commission shall allow only that
portion, if any, of a requested cost of fuel and fuel-related costs adjustment that is based on
adjusted and reasonable cost of fuel and fuel-related costs prudently incurred under efficient
management and economic operations. In evaluating whether cost of fuel and fuel-related costs
*H1168-v-1*
General Assembly Of North Carolina Session 2025
were reasonable and prudently incurred, the Commission shall apply the rule adopted pursuant
to subsection (d1) of this section. To the extent that the Commission determines that an increment
or decrement to the rates of the utility due to changes in the cost of fuel and fuel-related costs
over or under base fuel costs established in the preceding general rate case is just and reasonable,
the Commission shall order that the increment or decrement become effective for all sales of
electricity and remain in effect until changed in a subsequent general rate case or annual
proceeding under this section."
SECTION 2. There is appropriated from the General Fund to the Utilities
Commission the sum of ten thousand dollars ($10,000) in nonrecurring funds for the 2026-2027
fiscal year to be used for purposes consistent with this act.
SECTION 3. This act becomes effective July 1, 2026, and applies to any rate-making
mechanisms filed by an electric public utility on or after that date.
Page 2 House Bill 1168-First Edition

Limit Electric Util. Hist. Fuel Cost Recovery

Sponsors

Rep. Terry Brown (D) sponsors H 1168, and 27 members have co-sponsored it.

Committees

H 1168 went before 1 committee: Rules, Calendar, and Operations of the House.

Rules, Calendar, and Operations of the House
Rules, Calendar, and Operations of the House
Referred to · May 4, 2026 · 446 Bills

History

H 1168 has taken 3 actions since Apr 30, 2026, the latest on May 4, 2026.

ChamberAction
May 4, 2026
House
Passed 1st Reading
May 4, 2026
House
Ref To Com On Rules, Calendar, and Operations of the House
Apr 30, 2026
House
Filed

Votes

H 1168 has not gone to a roll call.