S. 3947

U.S. SenateIn Senate Committee

Summary

S. 3947, the REWIRE Act, was introduced in the Senate on Feb 26, 2026 by Sen. David McCormick (R) with 1 co-sponsor. It was referred to Energy And Natural Resources, and last saw action on Apr 15, 2026: Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366.


Record

Text

S. 3947 has 1 co-sponsor.

sb3947/introduced-in-senate.txt
119 S3947 IS: Reconductoring Existing Wires for Infrastructure Reliability and Expansion Act
U.S. Senate
2026-02-26
text/xml
EN
Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.
II 119th CONGRESS 2d Session S. 3947 IN THE SENATE OF THE UNITED STATES February 26, 2026 Mr. McCormick (for himself and Mr. Welch ) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources A BILL
To amend the Federal Power Act to establish a categorical exclusion for reconductoring within existing rights-of-way, and for other purposes.
1.
Short title
This Act may be cited as the Reconductoring Existing Wires for Infrastructure Reliability and Expansion Act or the REWIRE Act .
2.
Definitions
In this Act:
(1)
Advanced transmission conductor
The term advanced transmission conductor means a conductor, including a carbon fiber conductor, a composite core conductor, a superconductor, and any other conductor, that—
(A)
has a direct current electrical resistance at least 10 percent lower than a traditional ACSR conductor of a similar diameter and weight;
(B)
has a potential energy carrying capacity at least 70 percent greater than a traditional ACSR conductor of a similar diameter and weight; and
(C)
has a coefficient of thermal expansion at least 50 percent lower than a traditional ACSR conductor of a similar diameter and weight.
(2)
ASCR conductor
The term ASCR conductor means an aluminum conductor steel-reinforced cable.
(3)
Bulk-power system
The term bulk-power system has the meaning given the term in section 215(a) of the Federal Power Act ( 16 U.S.C. 824o(a) ).
(4)
Commission
The term Commission means the Federal Energy Regulatory Commission.
(5)
Effective load carrying capability; ELCC
(A)
In general
The term effective load carrying capability or ELCC means the ability of a generating resource to produce electricity when the grid needs it, measured as the additional load (or perfect replacement capacity) that the system can supply with a particular generator of interest with no net change in reliability.
(B)
Clarification
The additional load (or perfect replacement capacity) referred to in subparagraph (A)—
(i)
may be measured using LOLE, EUE, or other metrics; and
(ii)
may be divided by the nameplate capacity of the generating resource to yield a percentage.
(6)
Electric Reliability Organization
The term Electric Reliability Organization has the meaning given the term in section 215(a) of the Federal Power Act ( 16 U.S.C. 824o(a) ).
(7)
Electric utility
The term electric utility has the meaning given the term in section 3 of the Federal Power Act ( 16 U.S.C. 796 ).
(8)
Expected unserved energy; EUE
The term expected unserved energy or EUE means the cumulative amount of energy (in megawatt-hours) per year that is not provided to customers due to outages.
(9)
Grid-enhancing technology
The term grid-enhancing technology means any hardware or software that—
(A)
increases the capacity, efficiency, reliability, resilience, or safety of transmission facilities and transmission technologies; and
(B)
is installed in addition to transmission facilities and transmission technologies—
(i)
to give operators of the transmission facilities and transmission technologies more situational awareness and control over the electric grid;
(ii)
to make the transmission facilities and transmission technologies more efficient; or
(iii)
to increase the transfer capacity of the transmission facilities and transmission technologies.
(10)
Independent System Operator
The term Independent System Operator has the meaning given the term in section 3 of the Federal Power Act ( 16 U.S.C. 796 ).
(11)
Integrated resource planning
The term integrated resource planning means modeling and evaluating how projected long-term electricity demands (such as electricity demands over periods of 5, 10, 20, or more years) within a service area can be met with a combination of electric generation resources that best achieve desired metrics, such as metrics relating to reliability, resilience, and cost.
(12)
Loss of load expectation; LOLE
(A)
In general
The term loss of load expectation or LOLE means the expected number of days per year that the available generation capacity is less than the system load for the applicable power grid region or service area.
(B)
Clarification
As of November 2023, a commonly acceptable value for loss of load expectation is 0.1 days per year, as described in the standard of the North American Electric Reliability Corporation entitled Planning Resource Adequacy Analysis, Assessment and Documentation and numbered BAL–502–RF–03.
(13)
National Laboratory
The term National Laboratory has the meaning given the term in section 2 of the Energy Policy Act of 2005 ( 42 U.S.C. 15801 ).
(14)
Planning reserve margin
(A)
In general
The term planning reserve margin means the quotient, expressed as a percentage, obtained by dividing—
(i)
the difference between—
(I)
deliverable electric system supply capacity for a power grid region or service area; and
(II)
net demand in that power grid region or service area; by
(ii)
net demand in that power grid region or service area.
(B)
Clarification
As of November 2023, a reserve margin falling within the range from 15 percent to 25 percent is typical for a power grid region or service area.
(15)
Power grid
The term power grid means that portion of an Interconnection (as defined in section 215(a) of the Federal Power Act ( 16 U.S.C. 824o(a) )) that is located within the United States, including the relevant portion of each of the following:
(A)
The Eastern Interconnection.
(B)
The Western Interconnection.
(C)
The Texas Interconnection.
(16)
Power grid region
The term power grid region means a geographic area—
(A)
located within a power grid; and
(B)
for which a regional entity (as defined in subsection (a) of section 215 of the Federal Power Act ( 16 U.S.C. 824o )) has enforcement authority under that section.
(17)
Probabilistic modeling
(A)
In general
The term probabilistic modeling means a modeling approach that uses statistics to simulate and quantify the likelihood of achieving desired metrics, taking into consideration all modeled uncertainties, for determination of the optimal resource portfolio, such as a modeling approach consistent with the document of the North American Electric Reliability Corporation entitled Probabilistic Assessment Technical Guideline Document and dated August 2016, including the recommendations described in that document.
(B)
Inclusion
The term probabilistic modeling includes modeling that can identify the most important parameters that impact a simulated metric for further characterization or optimization.
(18)
Regional Transmission Organization
The term Regional Transmission Organization has the meaning given the term in section 3 of the Federal Power Act ( 16 U.S.C. 796 ).
(19)
Reliability standard
The term reliability standard has the meaning given the term in section 215(a) of the Federal Power Act ( 16 U.S.C. 824o(a) ).
(20)
Resource adequacy
The term resource adequacy means the adequate supply and provision of electricity from various electric generation resources to meet projected electricity demands in a particular power grid region or service area.
(21)
Secretary
The term Secretary means the Secretary of Energy.
(22)
Service area
The term service area means the area or region served by—
(A)
an electric utility;
(B)
a Regional Transmission Organization; or
(C)
an Independent System Operator.
(23)
State regulatory authority
The term State regulatory authority has the meaning given the term in section 3 of the Federal Power Act ( 16 U.S.C. 796 ).
3.
Categorical exclusion for reconductoring
Part II of the Federal Power Act ( 16 U.S.C. 824 et seq. ) is amended by inserting after section 216 the following:
216A.
Grid capacity expansion in existing rights-of-way
(a)
Definition of previously disturbed or developed
In this section, the term previously disturbed or developed has the meaning given the term in section 1021.102(g)(1) of title 10, Code of Federal Regulations (or a successor regulation).
(b)
Establishment of categorical exclusion
Activities to increase the capacity of the electric grid within existing rights-of-way or on previously disturbed or developed land are a category of actions designated as being categorically excluded from the preparation of an environmental assessment or an environmental impact statement under the National Environmental Policy Act of 1969 ( 42 U.S.C. 4321 et seq. ).
(c)
Inclusions
The activities to which the categorical exclusion established by subsection (b) shall apply include any repair, maintenance, replacement, upgrade, modification, optimization, or minor relocation of, addition to, or addition of energy storage at or near, an existing electric transmission or distribution facility or associated infrastructure, including electrical substations, within an existing right-of-way or on otherwise previously disturbed or developed land, including reconductoring and installation of grid-enhancing technologies.
.
4.
Return on equity for advanced transmission conductors
Section 219 of the Federal Power Act ( 16 U.S.C. 824s ) is amended—
(1)
in subsection (a), by striking Not later than 1 year after the date of enactment of this section, the and inserting The ;
(2)
in subsection (b), in the matter preceding paragraph (1), by inserting issued under subsection (a) after rule ;
(3)
in subsection (c)—
(A)
in the second sentence, by striking The Commission and inserting the following:
(2)
Recoverable costs
The Commission
; and
(B)
in the first sentence, by striking In the rule issued under this section and inserting the following:
(1)
In general
In the rule issued under subsection (a)
;
(4)
in subsection (d), by striking All rates approved under the rules adopted pursuant to this section, including any revisions to the rules, are and inserting Any rate approved under a rule issued pursuant to this section (including a revision to a rule) shall be ; and
(5)
by adding at the end the following:
(e)
Advanced transmission conductors
(1)
Return on equity
Not later than 1 year after the date of enactment of the REWIRE Act , the Commission shall promulgate new, or revise existing, rules under this section to improve the return on equity for investments in advanced transmission conductors (as defined in section 2 of that Act).
(2)
Consumer protections
The Commission shall ensure that all rates approved under the rules promulgated or revised under this subsection (including any subsequent revisions to those rules) are just and reasonable and not unduly discriminatory or preferential, as required by subsection (d).
.
5.
State energy programs
Section 362(c)(7)(B) of the Energy Policy and Conservation Act ( 42 U.S.C. 6322(c)(7)(B) ) is amended by inserting , including reconductoring with advanced transmission conductors (as defined in section 2 of the REWIRE Act ) and the installation of grid-enhancing technologies (as defined in that section) before the semicolon at the end.
6.
National Laboratory modeling and evaluation program
(a)
In general
The Secretary, acting through 1 or more National Laboratories, in consultation with the Commission and the Electric Reliability Organization, shall establish a program to model and evaluate the performance of the electric grid.
(b)
Requirements
In carrying out the program established under subsection (a), the Secretary shall develop 1 or more probabilistic models for transmission planning, resource adequacy modeling, and integrated resource planning that—
(1)
reflect the specific needs, resources, and attributes of a given power grid region or service area;
(2)
ensure consistent methods based on best practices;
(3)
include consideration of uncertainties relating to—
(A)
transmission systems and infrastructure;
(B)
the impact of weather (such as the impact of temperature on transmission facilities, including line ratings);
(C)
congestion and thermal overload; and
(D)
the costs of new or modified transmission infrastructure, including reconductoring with advanced transmission conductors and the deployment of grid-enhancing technologies; and
(4)
include consideration of other relevant transmission uncertainties, including those which may be unique to a given power grid region or service area, as determined by the Secretary in consultation with the Commission.
(c)
Use of modeling
The Secretary shall ensure that the models developed pursuant to the program established under subsection (a) may be used, at a minimum—
(1)
to simulate and quantify desired metrics, taking into consideration the relevant uncertainties described in paragraphs (3) and (4) of subsection (b), which may be used to assist in transmission planning and the determination of the optimal resource portfolio for the applicable power grid region or service area, including—
(A)
loss of load expectation;
(B)
expected unserved energy;
(C)
effective load carrying capability (also known as capacity value );
(D)
planning reserve margin;
(E)
electricity transmission losses;
(F)
congestion; and
(G)
cost;
(2)
to identify the parameters and processes considered under subsection (b) that—
(A)
have the most impact on the magnitude or uncertainty of the applicable simulated metrics; and
(B)
can be further characterized or optimized to improve the modeling and determination of the optimal resource portfolio and transmission system for the applicable power grid region or service area; and
(3)
to identify areas where the deployment of advanced transmission technologies, such as advanced transmission conductors or grid-enhancing technologies, may improve electric grid performance.
(d)
Regional collaboratives
(1)
In general
In carrying out the program under subsection (a), the Secretary shall establish regional collaboratives between the National Laboratories and institutions of higher education.
(2)
Considerations
The Secretary shall, to the maximum extent practicable, prioritize establishing regional collaboratives under paragraph (1) that—
(A)
are between regional institutions of higher education and National Laboratories that are owned and operated by the Federal Government;
(B)
include institutions of higher education with existing demonstration capability, such as field-scale systems of not less than 100 kilovolt-amperes or laboratory capabilities of not less than 10 kilovolt-amperes, to support technology validation, utility adoption, industry engagement, and workforce development;
(C)
demonstrate rural grid planning models (including transmission and distribution co-simulation and digital twin capabilities); or
(D)
utilize existing active data sharing and joint modeling programs between institutions of higher education and participating utilities at a statewide scale.
7.
Technical assistance relating to the use of advanced transmission conductors
(a)
Definitions
In this section:
(1)
Developer
The term developer means a developer of electric transmission facilities or technologies that pays to install a high-voltage transmission conductor.
(2)
Eligible entity
The term eligible entity means—
(A)
a developer;
(B)
an electric utility;
(C)
a State;
(D)
a Regional Transmission Organization or Independent System Operator; or
(E)
any other relevant entity, as determined by the Secretary.
(b)
Technical assistance and application guide
(1)
Application guide
Not later than 1 year after the date of enactment of this Act, the Secretary shall establish an application guide for eligible entities seeking to implement—
(A)
advanced transmission conductors, including through reconductoring with advanced transmission conductors; and
(B)
grid-enhancing technologies.
(2)
Updates
The guide established under paragraph (1) shall be reviewed and updated annually.
(3)
Technical assistance
(A)
In general
On request of an eligible entity using the guide established under paragraph (1), the Secretary shall provide technical assistance to that eligible entity with respect to the use of advanced transmission conductors and grid-enhancing technologies for particular applications.
(B)
Clearinghouse
In carrying out subparagraph (A), the Secretary shall establish a clearinghouse of previously completed projects that the Secretary and eligible entities may use to identify issues and solutions relating to—
(i)
the use of advanced transmission conductors;
(ii)
reconductoring with advanced transmission conductors; and
(iii)
the use of grid-enhancing technologies.

Tracker

The tracker indicates the progress of this legislation as it moves through the legislative process.

  1. Introduced2026-02-26
  2. Passed Senate
  3. Passed House
  4. Conference
  5. To President
  6. Became Law

A bill to amend the Federal Power Act to establish a categorical exclusion for reconductoring within existing rights-of-way, and for other purposes.

Sponsors

Sen. David McCormick (R) sponsors S. 3947, and 1 member has co-sponsored it from the day it was introduced.

Committees

S. 3947 went before 2 committees: Energy Subcommittee and Energy and Natural Resources.

Energy Subcommittee
Energy Subcommittee
Hearings By (subcommittee) · Apr 15, 2026
Energy and Natural Resources
Energy and Natural Resources
Referred To · Feb 26, 2026 · 314 Bills

Actions

S. 3947 has taken 3 actions since Feb 26, 2026, the latest on Apr 15, 2026.

ChamberAction
Apr 15, 2026
Senate
Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366.Energy Subcommittee
Feb 26, 2026
Senate
Read twice and referred to the Committee on Energy and Natural Resources.Energy and Natural Resources Committee
Feb 26, 2026
Introduced in Senate

Votes

S. 3947 has not gone to a roll call.

Titles

S. 3947 goes by 4 titles, 2 of them short titles.

  • REWIRE Act — Display Title
  • REWIRE Act — Short Title(s) as Introduced
  • Reconductoring Existing Wires for Infrastructure Reliability and Expansion Act — Short Title(s) as Introduced
  • A bill to amend the Federal Power Act to establish a categorical exclusion for reconductoring within existing rights-of-way, and for other purposes. — Official Title as Introduced

Lobbying

31 clients hired 33 firms and 265 registered lobbyists who named S. 3947 in 64 quarterly filings, 2026. Reported under the Lobbying Disclosure Act; a filing’s income covers everything its registrant worked that quarter, so the amounts below are the filings’, not this bill’s.

Filed under Energy/Nuclear, Taxation/Internal Revenue Code, Budget/Appropriations, Environment/Superfund, Transportation, Homeland Security, Telecommunications, Defense.

Clients

Who paid to be heard, by how many filings named the bill. The 20 that filed most often, of 31.

ClientBusinessStateFirmsFilingsReported
EDISON ELECTRIC INSTITUTEAssociation of US shareholder-owned electric companiesDistrict of Columbia25$100K
CENTER FOR CLIMATE AND ENERGY SOLUTIONSVirginia14
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONTrade association of electrical equipment manufacturersVirginia23$50K
CHAMBER OF COMMERCE OF THE U.S.A.District of Columbia13
CORPORATE ENERGY BUYERS ASSOCIATIONDistrict of Columbia13
DUKE ENERGY CORPORATIONDistrict of Columbia13
PORTLAND GENERAL ELECTRICOregon13
FIRSTENERGY SERVICES COMPANYDiversified Energy CompanyOhio12$100K
IKEA US RETAIL LLCMultinational home and furniture retailer.Pennsylvania12$100K
CTC GLOBAL CORPORATIONElectricity Transmission ManufacturerCalifornia12$80K
AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONSDistrict of Columbia12
CERES, INC.Massachusetts12
CMS ENERGY CORPDistrict of Columbia12
EARTHJUSTICE ACTIONnonprofit advocacy organizationDistrict of Columbia12
ENTERGY SERVICES LLCDistrict of Columbia12
FIRSTENERGY CORPOhio12
HONEYWELL INTERNATIONALDistrict of Columbia12
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIESDistrict of Columbia12
NATIONAL ASSOCIATION OF STATE ENERGY OFFICIALSNASEO is the only national non-profit association for the governor-designated energy officVirginia12
NATIONAL GRID USADistrict of Columbia12

Firms

Registrants who filed on the bill, by filings.

Lobbyists

Named on the filings that cite the bill. The 20 named most often, of 265.

Filings

The documents themselves, on the Senate’s Lobbying Disclosure site, largest reported first.

ClientRegistrantPeriodReportedDocument
CHAMBER OF COMMERCE OF THE U.S.A.CHAMBER OF COMMERCE OF THE U.S.A.2026 first_quarter$19.8M1st Quarter - Amendme…
CHAMBER OF COMMERCE OF THE U.S.A.CHAMBER OF COMMERCE OF THE U.S.A.2026 first_quarter$19.8M1st Quarter - Report
CHAMBER OF COMMERCE OF THE U.S.A.CHAMBER OF COMMERCE OF THE U.S.A.2026 second_quarter$17M2nd Quarter - Report
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIESMETA PLATFORMS, INC. AND VARIOUS SUBSIDIARIES2026 first_quarter$7.1M1st Quarter - Report
META PLATFORMS, INC. AND VARIOUS SUBSIDIARIESMETA PLATFORMS, INC. AND VARIOUS SUBSIDIARIES2026 second_quarter$6M2nd Quarter - Report
SOUTHERN COMPANYSOUTHERN COMPANY2026 second_quarter$3.2M2nd Quarter - Report
EDISON ELECTRIC INSTITUTEEDISON ELECTRIC INSTITUTE2026 first_quarter$2.6M1st Quarter - Amendme…
EDISON ELECTRIC INSTITUTEEDISON ELECTRIC INSTITUTE2026 first_quarter$2.6M1st Quarter - Report
DUKE ENERGY CORPORATIONDUKE ENERGY CORPORATION2026 second_quarter$2.3M2nd Quarter - Amendme…
DUKE ENERGY CORPORATIONDUKE ENERGY CORPORATION2026 second_quarter$2.3M2nd Quarter - Report
DUKE ENERGY CORPORATIONDUKE ENERGY CORPORATION2026 first_quarter$2.1M1st Quarter - Report
HONEYWELL INTERNATIONALHONEYWELL INTERNATIONAL2026 first_quarter$1.9M1st Quarter - Report
EDISON ELECTRIC INSTITUTEEDISON ELECTRIC INSTITUTE2026 second_quarter$1.7M2nd Quarter - Report
HONEYWELL INTERNATIONALHONEYWELL INTERNATIONAL2026 second_quarter$1.6M2nd Quarter - Report
AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONSAMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS2026 first_quarter$1.2M1st Quarter - Report
XCEL ENERGY INCXCEL ENERGY, INC2026 first_quarter$960K1st Quarter - Report
INFORMATION TECHNOLOGY INDUSTRY COUNCILINFORMATION TECHNOLOGY INDUSTRY COUNCIL2026 second_quarter$720K2nd Quarter - Report
ENTERGY SERVICES LLCENTERGY SERVICES, LLC2026 first_quarter$670K1st Quarter - Report
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION2026 second_quarter$650K2nd Quarter - Report
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION2026 first_quarter$640K1st Quarter - Report

Classification

The Congressional Research Service files S. 3947 under Energy, one of its 31 policy areas, and gives it 8 legislative subjects.

CRS Subjects

CRS assigns every bill one policy area from its 31; S. 3947’s is Energy.

s3947/policy-areas.txt
EnergyAgriculture and FoodAnimalsArmed Forces and National SecurityArts, Culture, ReligionCivil Rights and Liberties, Minority IssuesCommerceCongressCrime and Law EnforcementEconomics and Public FinanceEducationEmergency ManagementEnvironmental ProtectionFamiliesFinance and Financial SectorForeign Trade and International FinanceGovernment Operations and PoliticsHealthHousing and Community DevelopmentImmigrationInternational AffairsLabor and EmploymentLawNative AmericansPublic Lands and Natural ResourcesScience, Technology, CommunicationsSocial WelfareSports and RecreationTaxationTransportation and Public WorksWater Resources Development

Legislative Subjects

S. 3947 carries 8 of CRS’s legislative subjects, from Advanced technology and technological innovations to Research and development.

s3947/subjects.txt
Advanced technology and technological innovationsElectric power generation and transmissionEnergy efficiency and conservationEnergy pricesEnergy researchEnergy storage, supplies, demandGeography and mappingResearch and development

Source: congress.gov · legiscan.com