Search

Search bills, members, committees and pages...

H.R. 7288

U.S. HouseIn House Committee

Summary

H.R. 7288, the Western South Dakota Water Supply Project Feasibility Study Act, was introduced in the House on Jan 30, 2026 by Rep. Dusty Johnson (R). It was referred to Subcommittee on Water, Wildlife and Fisheries, and last saw action on Apr 16, 2026: Subcommittee Hearings Held.


Record

Text

H.R. 7288 has no co-sponsors and has not gone to a roll call.

hb7288/introduced-in-house.txt
119 HR 7288 IH: Western South Dakota Water Supply Project Feasibility Study Act
U.S. House of Representatives
2026-01-30
text/xml
EN
Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.
I 119th CONGRESS 2d Session H. R. 7288 IN THE HOUSE OF REPRESENTATIVES January 30, 2026 Mr. Johnson of South Dakota introduced the following bill; which was referred to the Committee on Natural Resources A BILL
To require the Secretary of the Interior to conduct a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water from the Missouri River to the Western Dakota Regional Water System, and for other purposes.
1.
Short title
This Act may be cited as the Western South Dakota Water Supply Project Feasibility Study Act .
2.
Definitions
In this Act:
(1)
Non-Federal project entity
The term non-Federal project entity means the Western Dakota Regional Water System, Inc., a nonprofit corporation.
(2)
Proposed rural water supply project
The term proposed rural water supply project means the proposed project to supply municipal, rural, and industrial water from the Missouri River to the Western Dakota Regional Water System.
(3)
Secretary
The term Secretary means the Secretary of the Interior.
3.
Western South Dakota water supply project feasibility study
(a)
Study
(1)
In general
The Secretary, in coordination with the non-Federal project entity, shall carry out a study to determine the feasibility of the proposed rural water supply project.
(2)
Feasibility report
After completion of the feasibility study for the proposed rural water supply project under paragraph (1), the Secretary shall—
(A)
develop a feasibility report that includes a recommendation of the Secretary on—
(i)
whether the proposed rural water supply project should be authorized for construction; and
(ii)
the appropriate non-Federal share of construction costs, which shall be—
(I)
at least 25 percent of the total construction costs; and
(II)
determined based on an analysis of the financial capability-to-pay the allocated construction and operations, maintenance, and replacement costs of the recommended plan;
(B)
submit the report under subparagraph (A) to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives; and
(C)
make the report under subparagraph (A) publicly available, along with associated feasibility study documents.
(3)
Consultation and cooperation
In addition to the non-Federal project entity, the Secretary shall consult and cooperate with appropriate Federal, State, Tribal, regional, and local authorities during the conduct of the feasibility study and development of the feasibility report under this subsection.
(b)
Cost-Sharing agreement for feasibility study costs
The Secretary shall enter into a cost-sharing agreement (or an appropriate financial assistance agreement, as determined by the Secretary) with the non-Federal project entity to conduct a study under subsection (a) that complies with the reclamation feasibility standards.
(c)
Federal share of feasibility study costs
The Federal share of the total costs of carrying out the feasibility study under subsection (a) shall not exceed 50 percent.
(d)
Authorization of appropriations
There is authorized to be appropriated to the Secretary to carry out this section $10,000,000.
(e)
Termination of authority
The authority provided by this section expires on the date that is 10 years after the date of enactment of this Act.

Tracker

The tracker indicates the progress of this legislation as it moves through the legislative process.

  1. Introduced2026-01-30
  2. Passed House
  3. Passed Senate
  4. Conference
  5. To President
  6. Became Law

To require the Secretary of the Interior to conduct a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water from the Missouri River to the Western Dakota Regional Water System, and for other purposes.

Sponsors

Rep. Dusty Johnson (R) sponsors H.R. 7288 alone.

Committees

H.R. 7288 went before 2 committees: Water, Wildlife and Fisheries Subcommittee and Natural Resources.

Water, Wildlife and Fisheries Subcommittee
Water, Wildlife and Fisheries Subcommittee
Hearings By (subcommittee) · Apr 16, 2026 · 24 Bills
Natural Resources
Natural Resources
Referred To · Jan 30, 2026 · 395 Bills

Actions

H.R. 7288 has taken 4 actions since Jan 30, 2026, the latest on Apr 16, 2026.

ChamberAction
Apr 16, 2026
House
Apr 9, 2026
House
Referred to the Subcommittee on Water, Wildlife and Fisheries.Water, Wildlife and Fisheries Subcommittee
Jan 30, 2026
House
Introduced in House
Jan 30, 2026
House
Referred to the House Committee on Natural Resources.Natural Resources Committee

Votes

H.R. 7288 has not gone to a roll call.

1 bill is related to H.R. 7288, as Identical bill.

Titles

H.R. 7288 goes by 3 titles, 1 of them short titles.

  • Western South Dakota Water Supply Project Feasibility Study Act — Display Title
  • Western South Dakota Water Supply Project Feasibility Study Act — Short Title(s) as Introduced
  • To require the Secretary of the Interior to conduct a study to determine the feasibility of constructing a project to supply municipal, rural, and industrial water from the Missouri River to the Western Dakota Regional Water System, and for other purposes. — Official Title as Introduced

Lobbying

1 client hired 1 firm and 1 registered lobbyist who named H.R. 7288 in 3 quarterly filings, 2026. Reported under the Lobbying Disclosure Act; a filing’s income covers everything its registrant worked that quarter, so the amounts below are the filings’, not this bill’s.

Filed under Budget/Appropriations.

Clients

Who paid to be heard, by how many filings named the bill.

ClientBusinessStateFirmsFilingsReported
WESTERN DAKOTA REGIONAL WATER SYSTEMWDRWS unites west SD towns/Tribes to lobby BOR for a regional water study.South Dakota13$21K

Firms

Registrants who filed on the bill, by filings.

RegistrantClientsFilingsReported
YELLOWSTONE STRATEGIES13$21K

Lobbyists

Named on the filings that cite the bill.

LobbyistFirmsClientsFilings
DREW LESOFSKI113

Filings

The documents themselves, on the Senate’s Lobbying Disclosure site, largest reported first.

ClientRegistrantPeriodReportedDocument
WESTERN DAKOTA REGIONAL WATER SYSTEMYELLOWSTONE STRATEGIES2026 second_quarter$7K2nd Quarter - Report
WESTERN DAKOTA REGIONAL WATER SYSTEMYELLOWSTONE STRATEGIES2026 first_quarter$7K1st Quarter - Amendme…
WESTERN DAKOTA REGIONAL WATER SYSTEMYELLOWSTONE STRATEGIES2026 first_quarter$7K1st Quarter - Report

Classification

The Congressional Research Service files H.R. 7288 under Water Resources Development, one of its 31 policy areas, and gives it 8 legislative subjects.

CRS Subjects

CRS assigns every bill one policy area from its 31; H.R. 7288’s is Water Resources Development.

hr7288/policy-areas.txt
Water Resources DevelopmentAgriculture and FoodAnimalsArmed Forces and National SecurityArts, Culture, ReligionCivil Rights and Liberties, Minority IssuesCommerceCongressCrime and Law EnforcementEconomics and Public FinanceEducationEmergency ManagementEnergyEnvironmental ProtectionFamiliesFinance and Financial SectorForeign Trade and International FinanceGovernment Operations and PoliticsHealthHousing and Community DevelopmentImmigrationInternational AffairsLabor and EmploymentLawNative AmericansPublic Lands and Natural ResourcesScience, Technology, CommunicationsSocial WelfareSports and RecreationTaxationTransportation and Public Works

Legislative Subjects

H.R. 7288 carries 8 of CRS’s legislative subjects, from Congressional oversight to Water use and supply.

hr7288/subjects.txt
Congressional oversightEnvironmental assessment, monitoring, researchGovernment information and archivesMissouri RiverRural conditions and developmentSouth DakotaWater resources fundingWater use and supply

Constitutional authority

The clause the sponsor cites as Congress’s power to enact H.R. 7288, as entered in the Congressional Record.

[Congressional Record Volume 172, Number 22 (Friday, January 30, 2026)][House]From the Congressional Record Online through the Government Publishing Office [www.gpo.gov]By Mr. JOHNSON of South Dakota:H.R. 7288.Congress has the power to enact this legislation pursuantto the following:Article I, Section 8 of the Constitution[Page H1922]

Source: congress.gov · legiscan.com