Search

Search bills, members, committees and pages...

S. 3034

U.S. SenateIn Senate Committee

Summary

S. 3034, the Reliable Power Act, was introduced in the Senate on Oct 23, 2025 by Sen. Tom Cotton (R) with 1 co-sponsor. It was referred to Energy And Natural Resources, and last saw action on Apr 15, 2026: Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366.


Record

Text

S. 3034 has 1 co-sponsor.

sb3034/introduced-in-senate.txt
119 S3034 IS: Reliable Power Act
U.S. Senate
2025-10-23
text/xml
EN
Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.
II
119th CONGRESS
1st Session
S. 3034
IN THE SENATE OF THE UNITED STATES
October 23, 2025
Mr. Cotton introduced the following bill;
which was read twice and referred to the Committee on Energy and Natural Resources
A BILL
To amend the Federal Power Act to require the Federal Energy Regulatory
Commission to review regulations that may affect the reliable operation of the
bulk-power system, and for other purposes.
1.
Short title
This Act may be cited as the Reliable Power Act .
2.
Commission review and comment for covered agency actions
Section 215 of the Federal Power Act ( 16 U.S.C. 824o ) is amended—
(1)
in subsection (g)—
(A)
by striking The ERO and inserting the following:
(1)
In general
The ERO
; and
(B)
by adding at the end the following:
(2)
Annual long-term assessment
The assessments under paragraph (1) shall include an annual long-term assessment, which shall include—
(A)
an analysis of the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability, taking into account—
(i)
generation resource mix;
(ii)
transmission development; and
(iii)
electric energy demand trends;
(B)
an analysis of—
(i)
the risk of future electric energy supply shortfalls under normal and extreme weather conditions; and
(ii)
the risk of any such shortfalls within each region of the bulk-power system; and
(C)
a determination of whether additional generation resources are necessary to supply sufficient electric energy to maintain an adequate level of reliability during the assessment period.
(3)
Notice of generation inadequacy
In conducting a long-term assessment under paragraph (2), if the ERO determines that the bulk-power system is at risk of not having adequate generation resources to supply sufficient electric energy to maintain an adequate level of reliability, the ERO shall publicly notify the Commission that the bulk-power system is in a state of generation inadequacy.
(4)
Data collection
To conduct a long-term assessment under paragraph (2), the ERO may collect information and data from users, owners, and operators of the bulk-power system.
;
(2)
by redesignating subsections (h) through (k) as subsections (i) through (l), respectively; and
(3)
by inserting after subsection (g) the following:
(h)
Commission review and comment for covered agency actions
(1)
Definitions
In this subsection:
(A)
Covered agency action
The term covered agency action means a regulation that—
(i)
relates to, or otherwise directly affects, any generation resource in the bulk-power system; and
(ii)
on the date on which the applicable Federal agency receives notice from the Commission under paragraph (2)—
(I)
is under development to be proposed; or
(II)
is otherwise under consideration in a rulemaking proceeding.
(B)
Federal agency
The term Federal agency means an Executive department (as defined in section 101 of title 5, United States Code) or any other Executive agency the head of which holds a Cabinet-level position.
(2)
Notice to Federal agencies
If the ERO notifies the Commission under subsection (g)(3) that the bulk-power system is in a state of generation inadequacy, the Commission shall promptly notify the Department of Energy, the Environmental Protection Agency, and any other Federal agency the Commission determines appropriate of that state of generation inadequacy.
(3)
Submission of covered agency actions to the Commission
(A)
In general
Not later than the applicable date described in subparagraph (B), the head of each Federal agency that receives a notification under paragraph (2) shall submit to the Commission for review and comment any covered agency action of the Federal agency.
(B)
Date described
The date referred to in subparagraph (A) is—
(i)
the first date on which the applicable covered agency action is provided to the Office of Management and Budget or any other Federal agency for review and comment;
(ii)
if the applicable covered agency action is not provided to the Office of Management and Budget or any other Federal agency for review and comment, the date that is 90 days before the date on which the covered agency action is published in the Federal Register or otherwise made available for public inspection or comment; or
(iii)
if, as of the date on which the Federal agency receives the applicable notification under paragraph (2), the covered agency action has already been provided to the Office of Management and Budget or any other Federal agency for review and comment, or has already been published in the Federal Register or otherwise made available for public inspection or comment, the date that is 60 days after the date on which the Federal agency received the notification.
(4)
Commission comments
The Commission, in consultation with the ERO and transmission organizations, shall, by order, provide to the Federal agency head that submitted to the Commission a covered agency action under paragraph (3)—
(A)
comments on the covered agency action, which may include an assessment of the effect of the covered agency action on rates, terms, and conditions for services pursuant to the authority of the Commission under sections 201 and 206; and
(B)
if applicable, recommendations for modifications to the covered agency action to prevent a significant negative impact on the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability.
(5)
Agency response
The head of a Federal agency may not finalize a covered agency action that is submitted to the Commission under paragraph (3) until—
(A)
the agency head responds in writing to the Commission with an explanation of how the agency head modified, or why the agency head determined not to modify, the covered agency action in response to any comments and recommendations provided by the Commission under paragraph (4); and
(B)
the Commission determines that the covered agency action is not likely to have a significant negative impact on the ability of the bulk-power system to supply sufficient electric energy to maintain an adequate level of reliability.
(6)
Public availability of comments and responses
A Federal agency head shall include any comments, recommendations, and responses relating to the covered agency action under paragraphs (4) and (5) in—
(A)
any submission of the covered agency action to the Federal Register for publication; and
(B)
any other place in which the covered agency action is otherwise made available for public inspection or comment.
.

Tracker

The tracker indicates the progress of this legislation as it moves through the legislative process.

  1. Introduced2025-10-23
  2. Passed Senate
  3. Passed House
  4. Conference
  5. To President
  6. Became Law

A bill to amend the Federal Power Act to require the Federal Energy Regulatory Commission to review regulations that may affect the reliable operation of the bulk-power system, and for other purposes.

Sponsors

Sen. Tom Cotton (R) sponsors S. 3034, and 1 member has co-sponsored it.

Committees

S. 3034 went before 2 committees: Energy Subcommittee and Energy and Natural Resources.

Energy Subcommittee
Energy Subcommittee
Hearings By (subcommittee) · Apr 15, 2026
Energy and Natural Resources
Energy and Natural Resources
Referred To · Oct 23, 2025 · 314 Bills

Actions

S. 3034 has taken 3 actions since Oct 23, 2025, the latest on Apr 15, 2026.

ChamberAction
Apr 15, 2026
Senate
Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366.Energy Subcommittee
Oct 23, 2025
Senate
Read twice and referred to the Committee on Energy and Natural Resources.Energy and Natural Resources Committee
Oct 23, 2025
Introduced in Senate

Votes

S. 3034 has not gone to a roll call.

Titles

S. 3034 goes by 3 titles, 1 of them short titles.

  • Reliable Power Act — Display Title
  • Reliable Power Act — Short Title(s) as Introduced
  • A bill to amend the Federal Power Act to require the Federal Energy Regulatory Commission to review regulations that may affect the reliable operation of the bulk-power system, and for other purposes. — Official Title as Introduced

Lobbying

16 clients hired 17 firms and 63 registered lobbyists who named S. 3034 in 39 quarterly filings, 2025 to 2026. Reported under the Lobbying Disclosure Act; a filing’s income covers everything its registrant worked that quarter, so the amounts below are the filings’, not this bill’s.

Filed under Budget/Appropriations, Energy/Nuclear, Taxation/Internal Revenue Code, Transportation, Environment/Superfund, Homeland Security, Telecommunications, Defense.

Clients

Who paid to be heard, by how many filings named the bill.

ClientBusinessStateFirmsFilingsReported
PACIFIC SALMON TREATY COALITION, INC.Represents Southeast Alaska commercial and recreational salmon fishing industry interestsAlaska16
EDISON ELECTRIC INSTITUTEAssociation of US shareholder-owned electric companiesDistrict of Columbia25$100K
DUKE ENERGY CORPORATIONDistrict of Columbia13
PORTLAND GENERAL ELECTRICOregon13
AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONSDistrict of Columbia12
AMERICAN PUBLIC POWER ASSOCIATIONVirginia12
CMS ENERGY CORPDistrict of Columbia12
FIRSTENERGY CORPOhio12
NATIONAL GRID USADistrict of Columbia12
NATIONAL MINING ASSOCIATIONDistrict of Columbia12
PPL CORPORATIONDistrict of Columbia12
PUGET SOUND ENERGYWashington12
SYSCO CORPORATIONFoodservice distributionTexas12
XCEL ENERGY INCDistrict of Columbia12
ENTERGY SERVICES LLCDistrict of Columbia11
PINNACLE WEST CAPITAL CORPORATIONDistrict of Columbia11

Firms

Registrants who filed on the bill, by filings.

Lobbyists

Named on the filings that cite the bill. The 20 named most often, of 63.

Filings

The documents themselves, on the Senate’s Lobbying Disclosure site, largest reported first.

ClientRegistrantPeriodReportedDocument
EDISON ELECTRIC INSTITUTEEDISON ELECTRIC INSTITUTE2026 first_quarter$2.6M1st Quarter - Amendme…
EDISON ELECTRIC INSTITUTEEDISON ELECTRIC INSTITUTE2026 first_quarter$2.6M1st Quarter - Report
DUKE ENERGY CORPORATIONDUKE ENERGY CORPORATION2026 second_quarter$2.3M2nd Quarter - Amendme…
DUKE ENERGY CORPORATIONDUKE ENERGY CORPORATION2026 second_quarter$2.3M2nd Quarter - Report
DUKE ENERGY CORPORATIONDUKE ENERGY CORPORATION2026 first_quarter$2.1M1st Quarter - Report
EDISON ELECTRIC INSTITUTEEDISON ELECTRIC INSTITUTE2026 second_quarter$1.7M2nd Quarter - Report
AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONSAMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS2026 first_quarter$1.2M1st Quarter - Report
XCEL ENERGY INCXCEL ENERGY, INC2026 first_quarter$960K1st Quarter - Report
NATIONAL MINING ASSOCIATIONNATIONAL MINING ASSOCIATION2026 second_quarter$820K2nd Quarter - Report
NATIONAL MINING ASSOCIATIONNATIONAL MINING ASSOCIATION2026 first_quarter$720K1st Quarter - Report
ENTERGY SERVICES LLCENTERGY SERVICES, LLC2026 first_quarter$670K1st Quarter - Report
FIRSTENERGY CORPFIRSTENERGY CORP2026 first_quarter$620K1st Quarter - Report
NATIONAL GRID USANATIONAL GRID USA2026 first_quarter$430K1st Quarter - Report
AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONSAMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS2026 second_quarter$380K2nd Quarter - Report
XCEL ENERGY INCXCEL ENERGY, INC2026 second_quarter$370K2nd Quarter - Report
CMS ENERGY CORPCMS ENERGY CORP2026 first_quarter$360K1st Quarter - Report
PUGET SOUND ENERGYPUGET SOUND ENERGY2026 second_quarter$350K2nd Quarter - Report
AMERICAN PUBLIC POWER ASSOCIATIONAMERICAN PUBLIC POWER ASSOCIATION2026 second_quarter$310K2nd Quarter - Report
AMERICAN PUBLIC POWER ASSOCIATIONAMERICAN PUBLIC POWER ASSOCIATION2026 first_quarter$300K1st Quarter - Report
FIRSTENERGY CORPFIRSTENERGY CORP2026 second_quarter$290K2nd Quarter - Report

Classification

The Congressional Research Service files S. 3034 under Energy, one of its 31 policy areas, and gives it 6 legislative subjects.

CRS Subjects

CRS assigns every bill one policy area from its 31; S. 3034’s is Energy.

s3034/policy-areas.txt
EnergyAgriculture and FoodAnimalsArmed Forces and National SecurityArts, Culture, ReligionCivil Rights and Liberties, Minority IssuesCommerceCongressCrime and Law EnforcementEconomics and Public FinanceEducationEmergency ManagementEnvironmental ProtectionFamiliesFinance and Financial SectorForeign Trade and International FinanceGovernment Operations and PoliticsHealthHousing and Community DevelopmentImmigrationInternational AffairsLabor and EmploymentLawNative AmericansPublic Lands and Natural ResourcesScience, Technology, CommunicationsSocial WelfareSports and RecreationTaxationTransportation and Public WorksWater Resources Development

Legislative Subjects

S. 3034 carries 6 of CRS’s legislative subjects, from Congressional oversight to Government studies and investigations.

s3034/subjects.txt
Congressional oversightElectric power generation and transmissionEnergy efficiency and conservationEnergy storage, supplies, demandGovernment information and archivesGovernment studies and investigations

Source: congress.gov · legiscan.com